Nacha Palomeque Coll
@naap_c
Nacha Palomeque Coll
Contact
About
Work
Concrete Island, Reclaiming The Westway’s Land (2020)
*1 1969, The Westway being built, communities being demolished. / *2 Overlayed site analysis with master plan proposal. / *3 *4 Model study of clamping mechanism for housing design intention. / *5 The Train, Level -1 floor plan. 7am colage of superimposed visual looking out from and towards the housing unit from the garden level. / *6 The Car, Level 0 floor plan. 8.50am colage of superimposed visual looking out from and towards the housing garage. / *7 The Path, Level 1 floor plan,. 6.30pm colage of superimposed visual looking out from and towards the housing unit from the path level. / *8 The Highway, Level 3 floor plan. 8.40pm colage of superimposed visual looking out from and towards the housing unit from the highway level. / *9 Section through proposed housing.